Unbranded
c1955 C Series 1-3 Dodge Trucks Service Operation Time Schedule Manual 100+pp VG
c1955 C Series 1-3 Dodge Trucks Service Operation Time Schedule Manual 100+pp VG
Regular price
$26.99 USD
Regular price
Sale price
$26.99 USD
Unit price
per
Shipping calculated at checkout.
Couldn't load pickup availability
Welcome to my listing for:
c1955 C Series 1-3 Dodge Trucks Service Operation Time Schedule Manual 100+pp VG
Undated. Showing only minor signs of wear or handling consistent with its age. Back cover with a slight full length vertical fold crease near center. Elsewhere, No tears, paper loss or any other major issues to note. Overall in good to very good condition. You will receive the exact booklet shown in the photos. Will display well in your collection. It measures approx. 5 1/2" x 8 1/2"
This will ship securely in a poly bag, inside a rigid mailer via USPS Ground Advantage service with a tracking number. The shipping cost for the first purchase is $4.00 and no extra cost for other additional items that can be shipped in the same package.
c1955 C Series 1-3 Dodge Trucks Service Operation Time Schedule Manual 100+pp VG
Undated. Showing only minor signs of wear or handling consistent with its age. Back cover with a slight full length vertical fold crease near center. Elsewhere, No tears, paper loss or any other major issues to note. Overall in good to very good condition. You will receive the exact booklet shown in the photos. Will display well in your collection. It measures approx. 5 1/2" x 8 1/2"
This will ship securely in a poly bag, inside a rigid mailer via USPS Ground Advantage service with a tracking number. The shipping cost for the first purchase is $4.00 and no extra cost for other additional items that can be shipped in the same package.
